Russian work calendar · teamAnnual Leave Schedule 2027
Build a team's annual leave schedule under the Russian Labour Code: every employee's leave parts on one year timeline, overlaps, checks and a ready Russian unified form T-7 in Excel and PDF.
Names and dates stay in your browser and are never uploaded
01
Employees and leave
drag along the timeline to add a part; click a row to open the employeetap a row to open the employee
Building a schedule for dozens of people is easier on a computer; here you can review, edit a part and export.
Department rulesOptional. Turn on if your employer requires it — these are company rules, not required by the Russian Labour Code. Saved in the schedule file.
Yearly limit
Days off at least, %
Working days a year, at most
28 → 20 working · 36 → 25 · 52 → 37
Your employer may require days off inside your leave — usually 5 : 2, like an ordinary week (for 28 days, 20 working days and 8 days off). Public holidays are not part of leave (Labour Code, Art. 120) and are not counted in the balance.
Entitlement and carry-over on 01.01 are set per employee, in their card.
Accrual startsAccrual methodRounding of the balance
Allowed advance, days
Unit
Seasons are calendar ones: winter — Dec, Jan, Feb; spring — Mar–May; summer — Jun–Aug; autumn — Sep–Nov. A part across seasons is split by days. With the limit per department, shares are counted within each.
Columns in order: full name · position · department · personnel no. · days · carry-over on 01.01 (optional, can be fractional — “5.33”). Separator — tab (as Excel copies) or semicolon. Extra columns are ignored.
An employee plans leave in the Annual Leave Planner, presses Share and sends the link. Paste the links — one per line.
No one in the schedule yet
Add employees one by one, paste a list from Excel or the links employees sent from the leave planner.
02
Checks and export
Summary
0 employees · 0 of 0 days planned · no warnings
Export
Add at least one employee with a leave part.
To pass the schedule on, save the file — we do not make links with names. The draft is kept in this browser.
Want each employee to mark their own leave? Build the schedule in a shared room on bringer.team: everyone adds their own dates, team rules are checked instantly and conflicts are visible to all. No sign-up, data is encrypted in the browser.→ Open bringer.team
Form T-7 detailsnot filled in — they go into the form header+
03
How to build a leave schedule
In Russia the leave schedule is approved no later than two weeks before the new year. Requests are easier to collect in November: employees plan their own leave and send a link, and you paste it into the schedule. Six rules the timeline checks:
No later than two weeks before the new year, that is by 17 December 2026, under Article 123 of the Russian Labour Code. If the organisation has an elected trade union body, its opinion is taken into account, and the header of form T-7 has a line for it. Employees' requests are easier to collect in November.
Add employees one by one or as a list pasted from Excel, then mark leave parts on the year timeline — public holidays inside are not deducted. Set how many people may be away at once and the days over the limit are highlighted. Employees can plan their own leave and send a link that drops into the schedule. Then download form T-7. If you want everyone to add their own dates, build the schedule in a shared room on bringer.team.
Enter the hire date on the employee card. Under Article 122 of the Russian Labour Code, first-year leave is due after six months of continuous work. If a part falls earlier, the schedule warns you and writes the date from which the right starts into the remarks column of form T-7: earlier leave is possible only by agreement.
Yes: the Russian unified form T-7 in Excel, a PDF for printing and a CSV for 1C or your own tables. Each leave part is a separate row with the name repeated, and column 5 holds the days without public holidays, that is, what will be deducted. Fill in the organisation details, union note and approver once — they go into the header.
Open Department rules, turn on Balance by season and set a norm, for example “summer at most 40% of days”. A strip under the timeline shows each season's share, and the summary tells you by how many days the norm is exceeded and whose parts could be moved. The manager moves them. This is a company rule, not a Russian Labour Code requirement, so it is off by default.
Nowhere. The schedule is calculated in your browser; names and leave dates are not sent to a server and never enter the page address. To come back to the schedule a week later or pass it to a manager, save the schedule file and open it later. The draft is kept in this browser, and we do not make links with names.
This site uses cookies and Yandex Metrica to understand how it’s used. Metrica loads only after you consent.Metrica and cookies — only after “Accept”.Consent to data processing · Learn more